EIA Coordinator
Transport for London
Project Details:
Managed the pre-submission stages for a proposed tram scheme for Sutton and Merton, including site, route and mode selection, consultation, and scoping for the EIA.
Take a look at our environment and sustainability projects using the tabs to navigate between our project categories.
You can see our international project coverage on the map below.
Transport for London
Project Details:
Managed the pre-submission stages for a proposed tram scheme for Sutton and Merton, including site, route and mode selection, consultation, and scoping for the EIA.
P&O Ports
Project Details:
Managed, coordinated and led all marine EIAs for a new harbour and port in the Thames Estuary, including dredging and reclamation, and preparation of Environmental Statements for all marine and ecological consents.
P&O Developments
Project Details:
Managed, coordinated and led all terrestrial EIAs for the onshore developments for the new London Gateway port, including warehousing, logistics/distribution, and new road and rail connections, and preparation of Environmental Statements for all transport and development consents.
Khalifa City A Authority
Project Details:
Directed the development of landscape, water supply and flooding proposals for the Khalifa City extension in Abu Dhabi, United Arab Emirates.
Delta Electricity Australia
Project Details:
Directed a number of environmental projects for Delta Electricity’s coal-fired power stations in New South Wales, Australia, including environmental audits, drainage, carbon capture, and an Environmental Impact Assessment for a US-designed fuel ash repository.
LXB
Project Details:
Undertook noise and air quality assessments for a mixed-use development comprising retail, commercial and residential proposals, and completion of Environmental Statement chapters.
Confidential Client
Project Details:
Completed costs assessments relating to noise, air quality and air quality damage relating to a proposed 1100 home development.
Thames Tideway
Project Details:
Acted as a specialist adviser for the implementation of the non-statutory compensation policy in respect of claims relating to noise, air quality, dust and lighting.
Genesis Housing Association
Project Details:
Undertook noise and air quality assessments for a proposed 1000 home development in outer London.
Wendover Council and House of Commons Select Committee
Project Details:
Undertook a detailed review of noise assessments in the HS2 Phase 1 Environmental Statement and subsequently gave expert evidence at the Select Committee of the House of Commons.
Rail Procurement Agency Ireland
Project Details:
Technical Lead and Project Manager for the noise, vibration, air quality and microclimate impact assessments and completion of the respective Environmental Statement chapters for the rail proposal.
BAM Ferrovial Kier (BFK) Consortium
Project Details:
Led the detailed groundborne noise and vibration assessments of mitigation designs for the construction of the new rail line crossing London.
Arup+ Consortium for HS2
Project Details:
Long-term contract appointment to manage all aspects of land access, preparing reports for HS2 and managing the Land Access team relating to the proposed routes for Phase 2B of HS2 from Crewe and Birmingham to Leeds and Manchester.
Various Clients
Project Details:
Managed the process for submitting and implementing planning applications, undertaking EIAs and preparing Environmental Statements for medium and large windfarms in England and Wales.
Private Clients
Project Details:
Managed the planning application, environmental surveys, EIA and Environmental Statement for a proposed 96MW windfarm and submission of the appeal to the Planning Inspectorate and representations to the Welsh Government.
EdF Energy
Project Details:
Lead Planner for planning and environmental submissions relating to site preparation and mitigation aspects for proposals to develop the major new nuclear power station in South West England.
M Baker Property Services
Project Details:
Coordinated environmental surveys and contributions to the planning application for a substantial new housing development in Poole, Dorset.
Highways Agency/Highways England
Project Details:
Managed all aspects of the Environmental Impact Assessments and completion of Environmental Statements for various motorway widening schemes in England, including surveys, mitigation, report review and submission, and consultations with third parties.
Glendale Horticulture
Project Details:
Supported planning proposals for the release of land from horticultural use to other uses through the local planning process including housing and supporting development for two sites in Kent.
West London Mental Health Trust
Project Details:
Undertook extensive consultations and assessments of potential impacts on ecologically protected sites of residential development, and prepared mitigation strategies and designs including Suitable Alternative Natural Greenspace.
Cory Environmental
Project Details:
Led the preparation of evidence of the ecological effects of emissions from the proposed plant, and responded to objections at the subsequent public inquiry.
Stroud District Council
Project Details:
Provided advice to Council Planning Officers to determine a wide range of planning applications in the District, in accordance with legislation and policy.
Stroud District Council
Project Details:
Helped the Council to develop strategies to avoid ecological impact on the River Severn Estuary and Rodborough Common, both of which are protected under the Habitats Regulations and other forms of protection.
Various Councils in Southern England
Project Details:
Provided mitigation strategy advice and guidance to various Councils relating to assessing and mitigating predicted effects of development proposals on a variety of protected sites.
Various Councils
Project Details:
Provided specialist ecological advice to various Councils in respect of applying emerging Government guidance on Biodiversity Net Gain to their local areas and implementation of their policies.
Capita Consortium for HS2 (Capita/Ineco/AECOM)
Project Details:
Lead Author managing all authorship and assurance aspects of the draft and formal Environmental Statements, covering Crewe to Manchester and West Midlands to Leeds, for review by statutory and parliamentary stakeholders.
NEAS, Environment Agency
Project Details:
Provided strategic input and eco-innovation to the TEAM2100 programme, designed to improve tidal flood risk management for the first 10 years of the 100-year plan over 175km of the River Thames.
Network Rail
Project Details:
Consents and Environment Manager for the design and construction of the electrification project and preparation of an award-winning audit of constructed installations.
Atkins Consortium for HS2b
Project Details:
Delivered 265 Design Element Statements involving landscape and environmental design, mitigation, optioneering sifts and other amendments to the HS2 Phase 1 Environmental Statement including Landscape and Visual Assessments.
Highways England
Project Details:
Managed all aspects of the five-year Post-Opening Project Evaluation for the scheme, including illustrations, mitigation, reporting and consultations.
The Whitley Wildlife Conservation Trust
Project Details:
Advice and husbandry guidelines and a publication based on research for Paignton Zoo designed to inform and mitigate predicted effects of husbandry development proposals.
Sommerlee Homes Ltd/Barratts David Wilson Homes Kent, ED (Sturry) Ltd and Kent County Council
Project Details:
Scoping Reports, ESs and ES Addendums production for large adjacent residential developments allocated as Land at Sturry/Broad Oak Strategic Site. Provision of nutrient neutrality advice. Environmental advice for associated Sturry Link Road project.
LXB and The Crown Estate
Project Details:
Production of ESs, ES Addendums, technical EIA chapters, HRA screening reports and habitat and access management plan for land within an SPA, Ramsar and a SSSI to support 10 applications for interrelated commercial, moorings and road developments.
Environment Agency
Project Details:
Provided strategic planning advice for the development and protection of ‘green’ and ‘blue’ infrastructure for the Environment Agency’s representations to the 25 year South East Plan.
Marafiq
Project Details:
Planning and environmental adviser to Marafiq relating to permitting routes for proposed power stations and sewerage facilities and associated connections in Saudi Arabia’s Industrial Cities.
P&O Ports
Project Details:
Managed, coordinated and led all marine EIAs for a new harbour and port in the Thames Estuary, including dredging and reclamation, and preparation of Environmental Statements for all marine and ecological consents.
P&O Developments
Project Details:
Managed, coordinated and led all terrestrial EIAs for the onshore developments for the new London Gateway port, including warehousing, logistics/distribution, and new road and rail connections, and preparation of Environmental Statements for all transport and development consents.
Confidential Client
Project Details:
Completed costs assessments relating to noise, air quality and air quality damage relating to a proposed 1100 home development.
Genesis Housing Association
Project Details:
Undertook noise and air quality assessments for a proposed 1000 home development in outer London.
Various Clients
Project Details:
Managed the process for submitting and implementing planning applications, undertaking EIAs and preparing Environmental Statements for medium and large windfarms in England and Wales.
Private Clients
Project Details:
Managed the planning application, environmental surveys, EIA and Environmental Statement for a proposed 96MW windfarm and submission of the appeal to the Planning Inspectorate and representations to the Welsh Government.
EdF Energy
Project Details:
Lead Planner for planning and environmental submissions relating to site preparation and mitigation aspects for proposals to develop the major new nuclear power station in South West England.
M Baker Property Services
Project Details:
Coordinated environmental surveys and contributions to the planning application for a substantial new housing development in Poole, Dorset.
Glendale Horticulture
Project Details:
Supported planning proposals for the release of land from horticultural use to other uses through the local planning process including housing and supporting development for two sites in Kent.
Cory Environmental
Project Details:
Led the preparation of evidence of the ecological effects of emissions from the proposed plant, and responded to objections at the subsequent public inquiry.
Stroud District Council
Project Details:
Provided advice to Council Planning Officers to determine a wide range of planning applications in the District, in accordance with legislation and policy.
Network Rail
Project Details:
Consents and Environment Manager for the design and construction of the electrification project and preparation of an award-winning audit of constructed installations.
Delta Electricity Australia
Project Details:
Directed a number of environmental projects for Delta Electricity’s coal-fired power stations in New South Wales, Australia, including environmental audits, drainage, carbon capture, and an Environmental Impact Assessment for a US-designed fuel ash repository.
EdF Energy
Project Details:
Lead Planner for planning and environmental submissions relating to site preparation and mitigation aspects for proposals to develop the major new nuclear power station in South West England.
Brookhouse Developments
Project Details:
Provided design solutions on slope stability and remediation, and provided contract and procurement advice to the client for a major housing development.
Confidential Client
Project Details:
Completed a major ground investigation for a new facility for the Royal Air Force at a base in the East of England.
Homes and Communities Agency
Project Details:
Directed a major commission to remediate land contaminated by historic uses and practices, including coal tars and by-products, as a central part of regenerating the land for housing.
UK Coal
Project Details:
Managed decontamination, geotechnical improvements, landfill facility design and dewatering for a major regeneration and reclamation scheme on the site of a former colliery polluted by coke, gas and chemicals, to prepare it for a new community with recreational and environmental land uses.
Highways England
Project Details:
Assessed geological and geotechnical characteristics for 20km of proposed new motorway, and prepared an interpretive report on earthworks and foundations.
NEAS, Environment Agency
Project Details:
Provided strategic input and eco-innovation to the TEAM2100 programme, designed to improve tidal flood risk management for the first 10 years of the 100-year plan over 175km of the River Thames.
Network Rail
Project Details:
Consents and Environment Manager for the design and construction of the electrification project and preparation of an award-winning audit of constructed installations.
HS2
Project Details:
Coordinated and prepared all environmental pre-contract documents, for the Enabling Works and Main Works Contracts for the construction of HS2 in the West Midlands.
Transport for London
Project Details:
Managed the pre-submission stages for a proposed tram scheme for Sutton and Merton, including site, route and mode selection, consultation, and scoping for the EIA.
Marafiq
Project Details:
Planning and environmental adviser to Marafiq relating to permitting routes for proposed power stations and sewerage facilities and associated connections in Saudi Arabia’s Industrial Cities.
P&O Ports
Project Details:
Managed, coordinated and led all marine EIAs for a new harbour and port in the Thames Estuary, including dredging and reclamation, and preparation of Environmental Statements for all marine and ecological consents.
P&O Developments
Project Details:
Managed, coordinated and led all terrestrial EIAs for the onshore developments for the new London Gateway port, including warehousing, logistics/distribution, and new road and rail connections, and preparation of Environmental Statements for all transport and development consents.
Thames Tideway
Project Details:
Acted as a specialist adviser for the implementation of the non-statutory compensation policy in respect of claims relating to noise, air quality, dust and lighting.
Wendover Council and House of Commons Select Committee
Project Details:
Undertook a detailed review of noise assessments in the HS2 Phase 1 Environmental Statement and subsequently gave expert evidence at the Select Committee of the House of Commons.
Rail Procurement Agency Ireland
Project Details:
Technical Lead and Project Manager for the noise, vibration, air quality and microclimate impact assessments and completion of the respective Environmental Statement chapters for the rail proposal.
BAM Ferrovial Kier (BFK) Consortium
Project Details:
Led the detailed groundborne noise and vibration assessments of mitigation designs for the construction of the new rail line crossing London.
Arup+ Consortium for HS2
Project Details:
Long-term contract appointment to manage all aspects of land access, preparing reports for HS2 and managing the Land Access team relating to the proposed routes for Phase 2B of HS2 from Crewe and Birmingham to Leeds and Manchester.
Private Clients
Project Details:
Managed the planning application, environmental surveys, EIA and Environmental Statement for a proposed 96MW windfarm and submission of the appeal to the Planning Inspectorate and representations to the Welsh Government.
Delta Electricity Australia
Project Details:
Directed a number of environmental projects for Delta Electricity’s coal-fired power stations in New South Wales, Australia, including environmental audits, drainage, carbon capture, and an Environmental Impact Assessment for a US-designed fuel ash repository.
EdF Energy
Project Details:
Lead Planner for planning and environmental submissions relating to site preparation and mitigation aspects for proposals to develop the major new nuclear power station in South West England.
Highways Agency/Highways England
Project Details:
Managed all aspects of the Environmental Impact Assessments and completion of Environmental Statements for various motorway widening schemes in England, including surveys, mitigation, report review and submission, and consultations with third parties.
Cory Environmental
Project Details:
Led the preparation of evidence of the ecological effects of emissions from the proposed plant, and responded to objections at the subsequent public inquiry.
Highways England
Project Details:
Assessed geological and geotechnical characteristics for 20km of proposed new motorway, and prepared an interpretive report on earthworks and foundations.
Westlakes Engineering
Project Details:
Completed assessments of rock slopes, earthworks, dewatering designs, blasting disturbance and soil nailing design, for the construction of the new nuclear power station in South West England.
Capita Consortium for HS2 (Capita/Ineco/AECOM)
Project Details:
Lead Author managing all authorship and assurance aspects of the draft and formal Environmental Statements, covering Crewe to Manchester and West Midlands to Leeds, for review by statutory and parliamentary stakeholders.
Atkins Consortium for HS2b
Project Details:
Delivered 265 Design Element Statements involving landscape and environmental design, mitigation, optioneering sifts and other amendments to the HS2 Phase 1 Environmental Statement including Landscape and Visual Assessments.
Highways England
Project Details:
Managed all aspects of the five-year Post-Opening Project Evaluation for the scheme, including illustrations, mitigation, reporting and consultations.
Marafiq
Project Details:
Planning and environmental adviser to Marafiq relating to permitting routes for proposed power stations and sewerage facilities and associated connections in Saudi Arabia’s Industrial Cities.
P&O Developments
Project Details:
Managed, coordinated and led all terrestrial EIAs for the onshore developments for the new London Gateway port, including warehousing, logistics/distribution, and new road and rail connections, and preparation of Environmental Statements for all transport and development consents.
Khalifa City A Authority
Project Details:
Directed the development of landscape, water supply and flooding proposals for the Khalifa City extension in Abu Dhabi, United Arab Emirates.
LXB
Project Details:
Undertook noise and air quality assessments for a mixed-use development comprising retail, commercial and residential proposals, and completion of Environmental Statement chapters.
Confidential Client
Project Details:
Completed costs assessments relating to noise, air quality and air quality damage relating to a proposed 1100 home development.
Genesis Housing Association
Project Details:
Undertook noise and air quality assessments for a proposed 1000 home development in outer London.
M Baker Property Services
Project Details:
Coordinated environmental surveys and contributions to the planning application for a substantial new housing development in Poole, Dorset.
Glendale Horticulture
Project Details:
Supported planning proposals for the release of land from horticultural use to other uses through the local planning process including housing and supporting development for two sites in Kent.
West London Mental Health Trust
Project Details:
Undertook extensive consultations and assessments of potential impacts on ecologically protected sites of residential development, and prepared mitigation strategies and designs including Suitable Alternative Natural Greenspace.
Brookhouse Developments
Project Details:
Provided design solutions on slope stability and remediation, and provided contract and procurement advice to the client for a major housing development.
Homes and Communities Agency
Project Details:
Directed a major commission to remediate land contaminated by historic uses and practices, including coal tars and by-products, as a central part of regenerating the land for housing.
UK Coal
Project Details:
Managed decontamination, geotechnical improvements, landfill facility design and dewatering for a major regeneration and reclamation scheme on the site of a former colliery polluted by coke, gas and chemicals, to prepare it for a new community with recreational and environmental land uses.